{"id":1803,"date":"2024-12-18T15:40:12","date_gmt":"2024-12-18T08:40:12","guid":{"rendered":"https:\/\/masterisehomes.com\/the-rivus\/?p=1803"},"modified":"2024-12-18T17:10:49","modified_gmt":"2024-12-18T10:10:49","slug":"construction-progress-update-in-december-2024-construction-progress-accelerates-completion-with-the-upcoming-completion-of-amenities-and-infrastructure-works","status":"publish","type":"post","link":"https:\/\/masterisehomes.com\/the-rivus\/en\/construction-progress-update-in-december-2024-construction-progress-accelerates-completion-with-the-upcoming-completion-of-amenities-and-infrastructure-works\/","title":{"rendered":"CONSTRUCTION PROGRESS UPDATE IN DECEMBER 2024:\u200b  <br>CONSTRUCTION PROGRESS ACCELERATES COMPLETION, <br>WITH THE UPCOMING COMPLETION OF AMENITIES AND INFRASTRUCTURE WORKS"},"content":{"rendered":"<p>As of December 2024, Masterise Homes team and its partners have made significant progress in the entire construction of The Rivus with many tasks completed on schedule and to the highest quality standards.\u200b<\/p>\n<p>Highlights as of December 2024:\u200b<\/p>\n<ul>\n<li>31 villas in the SAVA zone have completed 100% of the fa\u00e7ade works.\u200b<\/li>\n<li>The remaining villas have completed 100% of the superstructure works.\u200b<\/li>\n<li>Lift bridge begins a test run in November and progressing on the last stage.\u200b<\/li>\n<li>Marina Works: these decking are being installed and progressing on site.\u200b<\/li>\n<li>Children Park has completed 100% hardscape and planting of trees (Phase 1 and Phase 2).\u200b<\/li>\n<li>Central Park has completed 85% of the hardscape structure works and planting of trees commenced on site.\u200b<\/li>\n<li>River Park has completed 100% hardscape Phase 1 and 85% hardscape Phase 2. Planting of trees commenced on site.\u200b<\/li>\n<li>Infrastructure Works: 1st Asphalt layer completed for all zones; 100% complete Granite paving &amp; walkways at Zone 1 and progressing at Main gate, Zone 2-3.\u200b<\/li>\n<li>External infrastructure: 1st Asphalt layer completed from Phuoc Thien street to Gate 1 of The Rivus; Phuoc Thien street will be completed, with a synchronous infrastructure for the entire area at the end of January 2025.\u200b<\/li>\n<\/ul>\n<p>The construction site is advancing rapidly, with many items expected to be completed at the end of the year.\u200b<\/p>\n<p>Meanwhile, landscaping work, including green spaces and sidewalk installations is progressing steadily, to deliver a sustainable and luxurious living environment for future residents.\u200b\u200b<\/p>\n<p>Let\u2019s look at some of the latest pictures of The Rivus.\u200b<\/p>\n<figure id=\"attachment_1790\" aria-describedby=\"caption-attachment-1790\" style=\"width: 840px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-1790 size-large\" title=\"All villas in the SAVA zone have fully completed the fa\u00e7ade works, the Children Park is also 100% complete.\" src=\"https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/2-1024x767.jpg\" alt=\"All villas in the SAVA zone have fully completed the fa\u00e7ade works, the Children Park is also 100% complete.\" width=\"840\" height=\"629\" srcset=\"https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/2-1024x767.jpg 1024w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/2-300x225.jpg 300w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/2-768x575.jpg 768w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/2-1536x1150.jpg 1536w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/2-1200x898.jpg 1200w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/2.jpg 1945w\" sizes=\"(max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 1362px) 62vw, 840px\" \/><figcaption id=\"caption-attachment-1790\" class=\"wp-caption-text\">All villas in the SAVA zone have fully completed the fa\u00e7ade works, the Children Park is also 100% complete.<\/figcaption><\/figure>\n<figure id=\"attachment_1791\" aria-describedby=\"caption-attachment-1791\" style=\"width: 840px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-1791 size-large\" title=\"Close-up of some villas of the SAVA zone with completed fa\u00e7ade works &amp; Asphalt works.\u200b\" src=\"https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/3-1024x682.jpg\" alt=\"Close-up of some villas of the SAVA zone with completed fa\u00e7ade works &amp; Asphalt works.\u200b\" width=\"840\" height=\"559\" srcset=\"https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/3-1024x682.jpg 1024w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/3-300x200.jpg 300w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/3-768x512.jpg 768w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/3-1536x1023.jpg 1536w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/3-1200x800.jpg 1200w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/3.jpg 1945w\" sizes=\"(max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 1362px) 62vw, 840px\" \/><figcaption id=\"caption-attachment-1791\" class=\"wp-caption-text\">Close-up of some villas of the SAVA zone with completed fa\u00e7ade works &amp; Asphalt works.\u200b<\/figcaption><\/figure>\n<figure id=\"attachment_1794\" aria-describedby=\"caption-attachment-1794\" style=\"width: 840px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-1794 size-large\" title=\"Overview of some villas of the SAVA zone with completed fa\u00e7ade works &amp; Asphalt works.\u200b\" src=\"https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/6-1024x767.jpg\" alt=\"Overview of some villas of the SAVA zone with completed fa\u00e7ade works &amp; Asphalt works.\u200b\" width=\"840\" height=\"629\" srcset=\"https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/6-1024x767.jpg 1024w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/6-300x225.jpg 300w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/6-768x575.jpg 768w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/6-1536x1150.jpg 1536w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/6-1200x898.jpg 1200w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/6.jpg 1945w\" sizes=\"(max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 1362px) 62vw, 840px\" \/><figcaption id=\"caption-attachment-1794\" class=\"wp-caption-text\">Overview of some villas of the SAVA zone with completed fa\u00e7ade works &amp; Asphalt works.\u200b<\/figcaption><\/figure>\n<figure id=\"attachment_1792\" aria-describedby=\"caption-attachment-1792\" style=\"width: 840px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-1792 size-large\" title=\"Close-up of some villas of the SAVA zone have completed fa\u00e7ade works\u200b\" src=\"https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/4-1024x576.jpg\" alt=\"Close-up of some villas of the SAVA zone have completed fa\u00e7ade works\u200b\" width=\"840\" height=\"473\" srcset=\"https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/4-1024x576.jpg 1024w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/4-300x169.jpg 300w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/4-768x432.jpg 768w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/4-1536x864.jpg 1536w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/4-1200x675.jpg 1200w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/4.jpg 1945w\" sizes=\"(max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 1362px) 62vw, 840px\" \/><figcaption id=\"caption-attachment-1792\" class=\"wp-caption-text\">Close-up of some villas of the SAVA zone have completed fa\u00e7ade works\u200b<\/figcaption><\/figure>\n<div class=\"mceTemp\"><\/div>\n<figure id=\"attachment_1793\" aria-describedby=\"caption-attachment-1793\" style=\"width: 840px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-1793 size-large\" title=\"The lift bridge is testing in November; marina works progressing synchronously across multiple areas.\u200b\" src=\"https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/5-1024x767.jpg\" alt=\"The lift bridge is testing in November; marina works progressing synchronously across multiple areas.\u200b\" width=\"840\" height=\"629\" srcset=\"https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/5-1024x767.jpg 1024w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/5-300x225.jpg 300w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/5-768x575.jpg 768w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/5-1536x1150.jpg 1536w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/5-1200x898.jpg 1200w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/5.jpg 1945w\" sizes=\"(max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 1362px) 62vw, 840px\" \/><figcaption id=\"caption-attachment-1793\" class=\"wp-caption-text\">The lift bridge is testing in November; marina works progressing synchronously across multiple areas.\u200b<\/figcaption><\/figure>\n<figure id=\"attachment_1795\" aria-describedby=\"caption-attachment-1795\" style=\"width: 840px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-1795 size-large\" title=\"The Main gate is completed 100% &amp; Granite paving is processing.\u200b\" src=\"https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/7-1024x576.jpg\" alt=\"The Main gate is completed 100% &amp; Granite paving is processing.\u200b\" width=\"840\" height=\"473\" srcset=\"https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/7-1024x576.jpg 1024w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/7-300x169.jpg 300w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/7-768x432.jpg 768w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/7-1536x864.jpg 1536w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/7-1200x675.jpg 1200w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/7.jpg 1945w\" sizes=\"(max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 1362px) 62vw, 840px\" \/><figcaption id=\"caption-attachment-1795\" class=\"wp-caption-text\">The Main gate is completed 100% &amp; Granite paving is processing.\u200b<\/figcaption><\/figure>\n<figure id=\"attachment_1796\" aria-describedby=\"caption-attachment-1796\" style=\"width: 840px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-1796 size-large\" title=\"Central Park has completed 85% of the hardscape structure works and planting of trees commenced on site.\u200b\" src=\"https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/8-1024x767.jpg\" alt=\"Central Park has completed 85% of the hardscape structure works and planting of trees commenced on site.\u200b\" width=\"840\" height=\"629\" srcset=\"https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/8-1024x767.jpg 1024w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/8-300x225.jpg 300w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/8-768x575.jpg 768w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/8-1536x1150.jpg 1536w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/8-1200x898.jpg 1200w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/8.jpg 1945w\" sizes=\"(max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 1362px) 62vw, 840px\" \/><figcaption id=\"caption-attachment-1796\" class=\"wp-caption-text\">Central Park has completed 85% of the hardscape structure works and planting of trees commenced on site.\u200b<\/figcaption><\/figure>\n<figure id=\"attachment_1797\" aria-describedby=\"caption-attachment-1797\" style=\"width: 840px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-1797 size-large\" title=\"River Park has completed 100% hardscape Phase 1 and 85% hardscape Phase 2. Planting of trees commenced on site.\u200b\" src=\"https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/9-1024x682.jpg\" alt=\"River Park has completed 100% hardscape Phase 1 and 85% hardscape Phase 2. Planting of trees commenced on site.\u200b\" width=\"840\" height=\"559\" srcset=\"https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/9-1024x682.jpg 1024w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/9-300x200.jpg 300w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/9-768x512.jpg 768w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/9-1536x1023.jpg 1536w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/9-1200x800.jpg 1200w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/9.jpg 1945w\" sizes=\"(max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 1362px) 62vw, 840px\" \/><figcaption id=\"caption-attachment-1797\" class=\"wp-caption-text\">River Park has completed 100% hardscape Phase 1 and 85% hardscape Phase 2. Planting of trees commenced on site.\u200b<\/figcaption><\/figure>\n<figure id=\"attachment_1798\" aria-describedby=\"caption-attachment-1798\" style=\"width: 840px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-1798 size-large\" title=\"1st Asphalt layer completed for all zones; progressing walkways &amp; Granite paving at Main gate, Zone 2.\u200b\" src=\"https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/10-1024x767.jpg\" alt=\"1st Asphalt layer completed for all zones; progressing walkways &amp; Granite paving at Main gate, Zone 2.\u200b\" width=\"840\" height=\"629\" srcset=\"https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/10-1024x767.jpg 1024w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/10-300x225.jpg 300w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/10-768x575.jpg 768w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/10-1536x1150.jpg 1536w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/10-1200x898.jpg 1200w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/10.jpg 1945w\" sizes=\"(max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 1362px) 62vw, 840px\" \/><figcaption id=\"caption-attachment-1798\" class=\"wp-caption-text\">1st Asphalt layer completed for all zones; progressing walkways &amp; Granite paving at Main gate, Zone 2.\u200b<\/figcaption><\/figure>\n<figure id=\"attachment_1799\" aria-describedby=\"caption-attachment-1799\" style=\"width: 840px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-1799 size-large\" title=\"1st Asphalt layer completed from Phuoc Thien street to Gate 1 of The Rivus; Phuoc Thien street will be completed, with a synchronous infrastructure for the entire area at the end of January 2025.\u200b\" src=\"https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/11-1024x767.jpg\" alt=\"1st Asphalt layer completed from Phuoc Thien street to Gate 1 of The Rivus; Phuoc Thien street will be completed, with a synchronous infrastructure for the entire area at the end of January 2025.\u200b\" width=\"840\" height=\"629\" srcset=\"https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/11-1024x767.jpg 1024w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/11-300x225.jpg 300w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/11-768x575.jpg 768w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/11-1536x1150.jpg 1536w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/11-1200x898.jpg 1200w, https:\/\/masterisehomes.com\/the-rivus\/wp-content\/uploads\/2024\/12\/11.jpg 1945w\" sizes=\"(max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 1362px) 62vw, 840px\" \/><figcaption id=\"caption-attachment-1799\" class=\"wp-caption-text\">1st Asphalt layer completed from Phuoc Thien street to Gate 1 of The Rivus; Phuoc Thien street will be completed, with a synchronous infrastructure for the entire area at the end of January 2025.\u200b<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>As of December 2024, Masterise Homes team and its partners have made significant progress in the entire construction of The Rivus with many tasks completed on schedule and to the highest quality standards.\u200b Highlights as of December 2024:\u200b 31 villas in the SAVA zone have completed 100% of the fa\u00e7ade works.\u200b The remaining villas have &#8230;..<\/p>\n","protected":false},"author":4,"featured_media":1808,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/masterisehomes.com\/the-rivus\/wp-json\/wp\/v2\/posts\/1803"}],"collection":[{"href":"https:\/\/masterisehomes.com\/the-rivus\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/masterisehomes.com\/the-rivus\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/masterisehomes.com\/the-rivus\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/masterisehomes.com\/the-rivus\/wp-json\/wp\/v2\/comments?post=1803"}],"version-history":[{"count":4,"href":"https:\/\/masterisehomes.com\/the-rivus\/wp-json\/wp\/v2\/posts\/1803\/revisions"}],"predecessor-version":[{"id":1807,"href":"https:\/\/masterisehomes.com\/the-rivus\/wp-json\/wp\/v2\/posts\/1803\/revisions\/1807"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/masterisehomes.com\/the-rivus\/wp-json\/wp\/v2\/media\/1808"}],"wp:attachment":[{"href":"https:\/\/masterisehomes.com\/the-rivus\/wp-json\/wp\/v2\/media?parent=1803"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/masterisehomes.com\/the-rivus\/wp-json\/wp\/v2\/categories?post=1803"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/masterisehomes.com\/the-rivus\/wp-json\/wp\/v2\/tags?post=1803"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}