UPDATE CONSTRUCTION PROGRESS – JUN/2023: CONTINUE TO COMPLETE THE INSIDE AND AMENITIES
By the end of June 2023, the 05 Masteri Centre Point towers continued to complete the interior living space to the highest quality and most complete handover standards.
More than 1,300 apartments (up to the 18th floor of the towers) have been basically completed, are undergoing internal quality check and cleaning, and international standard furniture has been installed, providing future residents with top-class living space.
Furthermore, the towers' facade has been sprayed with final exterior paint. The shophouse area on the 1st and 2nd floors is implementing exterior stone tiling with imported European marble, harmonizing colors, and sustainable design, giving the project an elegant appearance.
Masterise Homes® and the main contractors are continuing to closely monitor construction items to the most rigorous standards, providing a modern lifestyle and being ready to welcome residents in 2023.
View the most recent photographs from Masteri Centre Point!
05 towers have been sprayed with final exterior paint, with work on the interior, amenities, and landscaping still ongoing.
The only project in Grand Park township to handover international standard furniture.
A close-up of the aluminium and glass section at Masteri Centre Point will add gold accents soon.
The shophouse area on the 1st & 2nd floors is being paved with high-quality marble imported from Europe.
The sloping ram roof at the basement entry is progressively taking shape following a modern and stunning design (actual photo and artist’s impression).
The apartment corridor is being completed according to the "5-star hotel" standard, with a width of 1.8m, comfortable for residents to walk, high-class walls with fireproof technology, bright colors.
Close-up of the apartment's main door in compliance with the beautiful door standard - luxury house, with exceptional design, gleaming stainless steel gold and copper strip accents in harmony with natural wood, both elegant and safe for future residents.
Maintaining development and commitment to the highest quality, more than 1300 units (up to 18th floors) at Masteri Centre Point have been basically completed and are in the process of internal quality control, providing residents with international standard quality.